
Calton Village, Glasgow
A multi-storey residential development where early fire protection proposals left a critical gap in compartmentation and heat-spread control.
- ✔ 60-minute integrity & insulation solution
- ✔ Fully tested Firefly Batt system
- ✔ Delivered in collaboration with McTaggart Construction
Working with TBA Firefly, we developed and installed a fully tested system that closed the gap and delivered long-term fire safety for the development.






